NOTE: The water should not be lowered beyond a visible point in the gauge glass. Intermittent Level Test ILT feature provides maximum boiler protection by removing power from the burner circuit at set intervals. This product does not comply with the "Safe Drinking Water Act," which requires that products meet low-lead standards in order to be used in systems providing water for human consumption drinking or cooking. Therefore, our standard return policy does not apply to this item. Automatically reactivates burner circuit 30 seconds after water reaches the probe, allowing optional water feeder to raise water level above the probe.
Intermittent Level Test – Maximum Protection for Foaming Boilers; 15 Second Burner Off Delay; 30 Second Burner On Delay; Low Water. Hydrolevel CG - Cyclegard Low Water Cutoff - 24V (Steam) - Intermittent Level Test – Maximum Protection for Foaming Boilers 15 Second Burner Off.
IF BURNER DOES NOT SHUT DOWN IN LOW WATER.
Hydrolevel Cyclegard CG 24V LWCO w/15Sec Delay
CycleGard low water cut-off is equipped with an Intermittent. ment of the boiler water level.
Submittal Sheet. CG Series. Make sure probe lead wire is properly secured to the terminal.
If the gauge glass shows that the water is at the correct operating level and the amber LED is lit check the following: 1. Delay prevents short cycling caused by momentary fluctuations in the boiler water level.
![]() Pwstr to c string find |
If the gauge glass shows that the water is at the correct operating level and the amber LED is lit check the following: 1.
Excessive use of Teflon tape or sealing compound may isolate the probe from the boiler shell. Video: Cycle guard cg400-2090 Getting my bike overhauled while I'm in Italy Failure to comply with this could result in substantial property damage, severe personal injury or death. Easy Returns No restocking fee for 90 days. Max Pressure PSI :. |

burner run cycle (10 or 20 minutes. Hydrolevel Cyclegard CG 24 volt low water cut off with intermittent level test (preformed every 20 minutes for 90 seconds), second burner off delay.
Add item to cart for lowest price. Check terminal block wiring to insure that all connections are cor- rect.
Video: Cycle guard cg400-2090 Basic steam cycle explained and demonstrated
The boiler will shut down within 15 seconds. Product Overview.
Cyclegard CG — Heating Help The Wall
This product does not comply with the "Safe Drinking Water Act," which requires that products meet low-lead standards in order to be used in systems providing water for human consumption drinking or cooking. Excessive use of Teflon tape or sealing compound may isolate the probe from the boiler shell. The amber LED lamp indicates that the water is below the probe.
Akizil